Deprecated: Function curl_close() is deprecated since 8.5, as it has no effect since PHP 8.0 in /home/u483256323/domains/poorvam.com/public_html/subdomains/pore/includes/api.php on line 184
Back to Search View Original Cite This Article

Abstract

<jats:p>This study compares the cost estimation time for structural work between conventional methods and 5D BIM for the Precision 5 National Police Building Project. Using a quantitative approach and case study, data was obtained from project documentation and simulations. The results show that 5D BIM significantly accelerated the estimation process without compromising accuracy.</jats:p>

Keywords

study estimation project compares cost

Related Articles


Deprecated: Function curl_close() is deprecated since 8.5, as it has no effect since PHP 8.0 in /home/u483256323/domains/poorvam.com/public_html/subdomains/pore/includes/api.php on line 76
PORE

About

Connect